History Buffs Chronicle Colorado Ski Lift Changes

Boulder, CO (Monday, July 17, 2006) - ColoradoSkiHistory.com has for five years been documenting ski lift installations, removals, and modifications throughout Colorado, and has released its survey for 2006. Since 2002, the number of new chairlifts installed annually in Colorado has increased by 78 percent. This year resorts are reaching deep in their financial pockets, building expensive projects that reflect last winter’s record skier numbers.

Breckenridge contracted Leitner-Poma last spring to construct the long-awaited gondola from the free parking lots to developments on Peak 7, moving to the Peak 7 base, and finally up to the Colorado Super Chair. The system will cost about $20 million and will feature eight-passenger cabins built by the Swiss company CWA.

Aspen Skiing Company is continuing with their $1 billion renovation of Snowmass. For this season, look for two new lifts: the Elk Camp Gondola and Assay Hill Quad. Both projects are being constructed and engineered by Leitner-Poma of Grand Junction. The gondola will replace the old Riblet Funnel lift and extend down to the base of Fanny Hill. Weitz is overseeing additional base area construction located at the bottom of the Village Express, which will eventually include new lodging, a conference center, retail shops and restaurants.

Doppelmayr CTEC has two projects this year in Colorado, including an eight-passenger gondola at Beaver Creek and a high-speed quad at Wolf Creek. The gondola will originate in the town of Avon and will connect to the Beaver Creek Mountain lifts near the free parking lots off of US Highway 6. The new high-speed quad at Wolf Creek is their first express lift and their fourth new CTEC brand chair.

NEW SKI LIFTS:
Area
Lift Name
Type
Manufacturer
Capacity
Avon/Beaver Creek
River Front Gondola
HSG8
Doppelmayr CTEC
N/A p/h
Breckenridge
Gondola
HSG8
Leitner-Poma
3,000
Crested Butte
East River
HSQ
Leitner-Poma
2,400
Kendall Mountain
Main Lift
FGD
Poma *
N/A
Snowmass
Gondola
HSG8
Leitner-Poma
N/A
Snowmass
Assay Hill
FGQ
Leitner-Poma
2,400
Steamboat
Sunshine
HSQ
Poma **
2,400
Winter Park
Vasquez Cirque
FGT
Yan ***
1,800
Wolf Creek
Raven Express
HSQ
Doppelmayr CTEC
2,400
Notes: Lifts relocated from: * Vermont, ** The Canyons, UT, *** Outrigger at Winter Park

REMOVED SKI LIFTS:
Area
Lift Name
Type
Manufacturer
Capacity
Crested Butte
East River
FGT
Poma
1,800 p/h
Snowmass
Assay Hill
FGD
Hall
1,200
Snowmass
Funnel
FGD
Riblet
1,200
Steamboat
Sunshine
FGT
Doppelmayr
1,800
Vail
Chair 1/Giant Steps
FGD
Riblet
1,200
Wolf Creek
Dickey
FGD
Borvig
1,200

MODIFIED SKI LIFTS:
Area
Lift Name
Type
Manufacturer
Capacity
Aspen Mountain
Silver Queen
HSG6
Poma
2,400 p/h
Gondola cabins were replaced with new CWA Omega models.
Telluride
Gondola: I, II, III
HSG8
CTEC Garaventa
N/A
Unspecified modifications by Doppelmayr CTEC

If there is only a title and date above, this story is from an external source. Click title, above, to open the external story.

Return to our Home Page.

Copyright © 2001-2008 First Tracks!! Online